TandemPanels.com is an independent tracker of commercial perovskite-silicon tandem module status. Tracking the shift from silicon's 22-24% baseline toward commercial tandem modules, as certified lab records clear 35.5%.
Commercial silicon sits at 22 to 24%, not its ceiling
Commercial single-junction silicon modules run 22-24% today, well short of the 29.4% practical limit. Stacking a perovskite top cell on top of proven silicon captures the energy that gap leaves on the table, certified lab records already clear 35.5%.
Commercial single-junction silicon modules (dominant TOPCon technology) are closing in on a practical limit of 29.4%. The material is approaching its ceiling, but has not reached it yet.
Stacking a perovskite top cell on top of proven silicon captures the high-energy photons silicon wastes as heat. The current certified lab record was set by LONGi.
The commercial yield math today
+13.6%
Moving from silicon's baseline to today's commercial tandem modules means more power from the same footprint, before efficiency climbs further.
Directory Preview
Who's building the tandem supply chain
A sample of the manufacturers, materials suppliers, and technology licensors listed in the B2B directory.
Featured
GCL Optoelectronics
Kunshan-based GCL unit runs what it calls the world's first GW-scale perovskite-silicon tandem production line.
Manufacturer
Featured
Helmholtz-Zentrum Berlin (HZB)
Leading European research institute renowned for repeatedly setting world efficiency records in tandem photovoltaics.
Research Institute
Featured
LONGi Green Energy
Global solar manufacturing giant holding multiple world records for perovskite-silicon tandem cell efficiency to date.
Lab-certified tandem cells have pushed past 33% power conversion efficiency, widening the gap with single-junction silicon and setting the pace for commercial roadmaps.
Depositing a uniform, defect-free perovskite layer at gigawatt scale is a harder manufacturing problem than mature silicon processing. Here is what is driving yield today.